Request for Quote - Industrial Piping Systems

Industrial RFQ
  1. Project name:*
    Invalid Input
  2. Contact name:*
    Invalid Input
  3. Contact email:*
    Invalid Input
  4. Contact phone:*
    Invalid Input
  5.  
  1. 1. Basic System Information
  2. Media and known chemicals:
    Invalid Input
  3. System process:
    Invalid Input
  4. Media temperature:
    Invalid Input
  5. Ambient temperature range:
    Invalid Input
  6. Install temperature:
    Invalid Input
  7. Operating pressure:
    Invalid Input
  8. Max system pressure:
    Invalid Input
  9. Flowrate(s):
    Invalid Input
  10. Size(s) required:
    Invalid Input
  11. SDR requested (leave blank if unknown):
    Invalid Input
  12. Presence of solids?
    Invalid Input
  13. UV exposure?
    Invalid Input
  14. Buried?
    Invalid Input
  15.  
  1. 2. Double Containment System Options.
    Please provide information below if system is to be double contained. If single wall, leave blank.
  2. Leak detection options - pressure (check if needed):
    Invalid Input

  3. Leak detection options - drainage (check if needed):
    Invalid Input

  4. Leak detection options - manual/probe (check if needed):
    Invalid Input

  5. Additional components (check if needed):
    Invalid Input
  6.  
  1. 3. Piping Material Selection.
    If you know what piping material you would like to use, please select it below. If you would like a recommendation from the Asahi/America Engineering Department, please fill out the chemical resistance information.

  2. Single wall pipe (leave blank if unknown):
    Invalid Input
  3. Other:
    Invalid Input

  4. Double wall pipe (leave blank if unknown):
    Invalid Input
  5. Other:
    Invalid Input

  6. For proprietary chemicals (or "trade-name" chemicals) a SDS form should be attached as well.
    Invalid Input
  7.  
  1. 4. Chemical Resistance Information.
    Please fill out if a material recommendation is required from the Asahi/America Engineering Department. For proprietary chemicals (or "trade-name" chemicals) a SDS form should be attached as well.
  2. Chemical 1 and Concentration:
    Invalid Input
  3. Chemical 2 and Concentration:
    Invalid Input
  4. Chemical 3 and Concentration:
    Invalid Input
  5. Chemical 4 and Concentration:
    Invalid Input
  6. Chemical 5 and Concentration:
    Invalid Input
  7. Operating temperature:
    Invalid Input
  8. Operating pressure:
    Invalid Input
  9. Max temperature:
    Invalid Input
  10. Max pressure:
    Invalid Input
  11. UV Exposure?
    Invalid Input
  12. Presence of solids?
    Invalid Input
  13.  
  1. 5. Installation Options
  2. Please indicate any additional service which might be required.
    Invalid Input

  3. Notes:
    1. Takeoffs cannot be done from process and instrumentation drawings (P&ID's). Site plans will be needed for accurate assessment for leak detection components and routing.
    2. It is the responsibility of the installing contractor to supply their sales contact with a proper material takeoff, as different methods of system layout are used.
    3. Asahi/America cannot and will not be held accountable for incorrect takeoffs and improperly ordered materials. We are here to assist the customer in choosing the correct product for the application.